skip to Main Content
1-800-987-654 admin@totalwptheme.com
Construction Imagery 640×340 09

Central cooling system – fixed

UPDATE (Aug 7): The central cooling system has been fixed for the A, B and south side of the C buildings; and is now up and running at full capacity. Thank you.

Jul 30: The central cooling system is down in the A, B, and south side of C buildings. We apologize for any inconvenience.

Facilities Department

Back To Top