October 6-8: Equipment moves and testing for Secondary Datacentre

Langara IT will be conducting ‘failover testing’ and equipment moves for the new, secondary datacentre in October.

On Saturday, October 6, 2018 and Sunday, October 7 days (9am to 6pm)

Most IT services including the following may experience minor outages of 1-minute or less:

  • WiFi
  • Internet
  • Banner
  • myLangara/Portal
  • myLangara Student Email
  • Brightspace

The following critical services will not be impacted during the Saturday/Sunday maintenance windows:

  • Phones will remain active
  • Code Blue Systems for emergency support will remain active

On Monday, October 8 day (9am to 6pm)

The following service will experience extended outages between 9am and 6pm:

  • MyLangara Student Email access
  • Citrix Lab access, on and off campus
  • Access to all network drives such as H: drive, J: drive & O: drive on-campus and Myfiles (http://myfiles.langara.ca) access to the network drives off-campus
  • Network Printing on campus

The following critical services will not be impacted on Monday:

  • Banner Student Information Services, Finance and HR systems
  • O365
  • College web site
  • Brightspace
  • Phones
  • Code Blue Systems
  • WiFi
  • Internet

Maintenance windows are selected to cause the least amount of down-time possible for critical College systems.

Thank you for your patience as we work towards the launch of the new datacentre for Langara College.